A newly built single-storey residence set on a generous, level woodland plot in Oiwake, Karuizawa. Designed as either a holiday home or a permanent residence, it pairs a low, wide-eaved profile and a large terrace with a quiet forest setting that is still close to town. Completion is scheduled for April 2027.
3 bedrooms plus living, dining and kitchen, with a built-in garage
Island kitchen (CUCINA)
Sauna and WABURO bath
Wood deck terrace
Underfloor heating in the living area, primary bedroom, bathroom and washroom
Flat site of 1,362 m² (412 tsubo) with 4 m public road frontage
Living Space
The home is arranged on a single level around an open living, dining and kitchen area with an island kitchen. It has three bedrooms, including the primary suite. Large glazing along the terrace side opens the interior toward the surrounding trees, and a wood deck runs along the façade.
Amenities
Underfloor heating serves the living area, primary bedroom, bathroom and washroom. Panel heaters cover the entrance hall, washroom and toilet, and air conditioning is installed in the living area and all three bedrooms. Wellness features include a sauna and a WABURO bath. Practical storage includes a shoe-in closet, walk-in closet, pantry and external storage, along with a built-in garage.
Lifestyle
Oiwake offers a quieter, more wooded alternative to central Karuizawa while remaining close to both Shinano-Oiwake Station and Karuizawa Station.
Access: 9.8 km to Karuizawa Station (Hokuriku Shinkansen) and 3.3 km to Shinano-Oiwake Station (Shinano Railway)
Disclaimer:Images are computer-generated illustrations; the building is under construction. Specifications, layout and completion date are subject to change.
For more information, please contact our team today.
<p>A newly built single-storey residence set on a generous, level woodland plot in Oiwake, Karuizawa. Designed as either a holiday home or a permanent residence, it pairs a low, wide-eaved profile and a large terrace with a quiet forest setting that is still close to town. Completion is scheduled for April 2027.</p>
<p><strong>Key Features</strong></p>
<ul>
<li>Newly built, single-storey, conventional timber-frame residence</li>
<li>3 bedrooms plus living, dining and…